Month: February 2013
2012 Worldwide Pipeline Construction Report With 118,623 miles of pipelines planned or under construction, with 12,000-15,000 sandbags required per mile, somewhere between 1.4 and 1.7 billion sandbags will be needed. The SandMaster with its capability of creating 15,000-18,000 sandbags in a […]
Read MoreWarming planet could make big floods more likely Could this actually be the case with flooding becoming more frequent with much larger and damaging events? We have seen some pretty extreme flooding around the world in the last few years […]
Read MoreCreate more sand bags for less.
SandMaster is the solution for 21st Century Flood Control.